PUMP STATION DESIGN


VARIOUS COUNTIES

MY KNOWLEDGE & SKILLSET

TYPICALLY THESE WERE INSTALLATIONS FOR GOVERNMENT MUNICIPALITIES.EQUIPMENT SPECIFICATION WAS INCLUDED IN THE SPECIFICATION DOCUMENTATION. I DESIGNED MANY PUMP STATIONS AS PART OF MY RESPONSIBILITIES IN THIS POSITION.

ACTUAL DESIGN PERFORMANCE:


DESIGN WAS DONE UNDER THE REVIEW OF THE PRINCIPAL ENGINEER. HE INSPECTED EACH DOCUMENT TO ASSURE ACCURACY AND SUGGEST CHANGES. BEFORE APPLYING HIS PE STAMP AND GIVING HIS APPROVAL.

I ROUTINELY PERFORMED THE CALCULATIONS. BACK UP GENERATOR SIZING WAS DONE USING GENERATOR SOFTWARE. I DID NOT CALCULATE BY HAND. SIMILAR WITH LIGHTING SELECTION, I WOULD SIZE THE LIGHTS BUT FOR FIXTURE SELECTIONS I WOULD CONSULT A LIGHTING SPECIALIST WHO WORKED WITH OUR COMPANY FOR IDEAL SOLUTIONS.

OBSERVATION

THIS IS ONLY TO DEMONSTRATE A ONE OF THE TASK SETS OF THE VARIOUS ASSIGNMENTS I HAVE DONE AS A ELECTRICAL DESIGNER CONSULTANT. THE PRINCIPAL WOULD ACCOMPANY ME TO SIGHTS FOR MEETINGS AND REVIEWS. WE DID WALK THROUGHS AND ANALYSIS OF SIGHT CONDITIONS SO I COULD BE AS ACCURATE IN DESIGN AS POSSIBLE.